Architectural Aluminium Ltd
Open

Miesian Plaza

Project: Miesian Plaza
Location: Dublin
Architect: Scott Tallon Walker Architects
Contractor: Architectural Aluminium Ltd

Miesian Plaza consists of three identically clad buildings, (Blocks A, B & C), built in two phases between 1968 and 1976 and constructed over a common basement. Originally designed by Scott Tallon Walker Architects the buildings are listed in the record of protected structures in the Dublin City Development plan (2011-2017)

The works comprise of the dismantling of the glazing and cladding system to allow the removal of all sealant material within the system. The cladding system will be refurbished (finishes addressed, new sealants, brackets etc.) and reinstated. New glass and glazing seals shall be installed complete with thermally broken capping's internally, thermal insulation to spandrels and firebreaks throughout.

Please note that at this time the repatination of the existing bronze profiles and cladding do not form part of this contract. However AAL will be co-operating with the design team to secure a commercially viable solution.

‹ Return to Commercial
Open

Our Video

X Close Window

Login

X
Email address:
Password:
Forgotten your password?
Close Window